Site selection through commissioning, for AI-ready builds where density broke the old playbook.
A data center designed for 10 kW racks cannot be patched into one that holds megawatt racks. The power chain, the cooling loop, the structural loading, and the commissioning plan all change at once. Red Sun Consulting advises owners, operators, and investors across the full build lifecycle, from the first site screen to the day the hall goes live.
We are independent of the EPC firms, the equipment vendors, and the design houses. That means our read on a site, a budget, or a schedule answers to your interests, not to a contract we are trying to win downstream.
Colocation operators retrofitting for AI density, enterprises and neoclouds planning a first large build, and the private equity and infrastructure funds underwriting these projects. When a deal hinges on whether a site can actually deliver the power and cooling the model assumes, we give a straight technical answer.
This practice draws on hands-on experience with a multi-billion-dollar onsite construction program, the Universal Beijing Resort build under Universal Creative and NBCUniversal, plus fifteen years leading infrastructure across the US and Greater China. The recurring lesson is that pure-play vendors deliver their equipment on time and the risk lives in the integration. We help you find those gaps before they become schedule slips.
AI infrastructure consulting · Zero trust and security architecture · Fractional CIO and CISO advisory
Most engagements begin with a 30-minute conversation to scope the right approach.